La première ressource minérale JORC de Gilar est terminée
11 Décembre 2023
Anglo-Asian Mining plc
Gilar maiden JORC (2012) Mineral Resource completed
Anglo Asian Mining plc ("Anglo Asian" or the "Company"), the AIM-listed gold, copper and silver producer focused on Azerbaijan, is pleased to announce the completion of a maiden JORC (2012) Mineral Resource for its Gilar polymetallic deposit (the "Gilar deposit") prepared by Mining Plus UK. The Gilar deposit was confirmed to have 6.10 million tonnes of mineralisation with average grades of 0.88 per cent. for copper and 1.30 grammes of gold per tonne.
Gilar deposit highlights
· 6.10 million tonnes of mineralisation with average grades of 0.88 per cent. copper, 0.75 per cent. zinc and 1.30 grammes of gold per tonne
· 5.90 million tonnes of mineralisation within the Measured plus Indicated JORC categories
· In-situ Mineral Resource of 54,000 tonnes of copper, 255,000 ounces of gold and 46,000 tonnes of zinc
· 135 drill holes (117 vertical and 18 inclined) with a total length of 42,821 metres used for the maiden Mineral Resource estimate
· 145 drill holes were completed for a total length of 46,409 metres
Mineral Resource estimate for the Gilar deposit at 30 November 2023
Reporting cut-off: >= 0.5 grammes per tonne of gold equivalent*
Tonnage (millions de tonnes) | In-situ grades | Métal confiné | |||||
Or (g / t) |
Cuivre (pour cent.) |
Zinc (pour cent.) |
Or (koz) |
Cuivre (kt) |
Zinc (kt) | ||
Mesuré | 3.88 | 1.49 | 1.08 | 0.91 | 186.06 | 42.09 | 35.43 |
Indiqué | 2.02 | 1.00 | 0.56 | 0.48 | 64.80 | 11.30 | 9.77 |
Mesuré + Indiqué | 5.90 | 1.32 | 0.90 | 0.77 | 250.86 | 53.39 | 45.20 |
Inféré | 0.20 | 0.70 | 0.26 | 0.26 | 4.38 | 0.50 | 0.51 |
Total | 6.10 | 1.30 | 0.88 | 0.75 | 255.24 | 53.89 | 45.72 |
Note that all tonnages reported are dry metric tonnes. Totals may not add due to rounding.
*Gold equivalent calculation = Gold grammes per tonne + (copper %*1.49) +(zinc*0.46). The metal price assumptions used were Gold - $1,675 per ounce; Copper - $8,000 per tonne; Zinc - $2,500 per tonne.
Interactive presentation on the Gilar deposit
An interactive 3-D presentation on the Gilar deposit including details of its maiden JORC Mineral Resource is available at https://gilar-jorc-mre-2023nov.jalnext.com/. This presentation also includes various depictions of the local topology of the Gilar deposit, details of drill holes, block and shell models and the location of the decline.
Reza Vaziri, CEO of Anglo Asian, commented:
"We are proud to present the maiden mineral resource estimate for the Gilar deposit under the JORC reporting code, which marks a significant milestone for the asset and reflects our commitment to international best practice. It is a great step forward in understanding its geo-positioning, mineralisation geometry and importantly the significant value opportunity it offers our stakeholders."
Stephen Westhead, Vice-President of Anglo Asian, commented:
"This maiden mineral resource estimate under the JORC reporting code is now very robust given the quantity of drilling that provided confidence in the mineral continuity. Tunnelling to access the mineralisation is progressing. To complement future underground drilling, further surface drilling will test the extension of the upper zones upon completing the ongoing geophysical investigation.
"The Gilar mine will be an important contributor to the future production of the Company given its high grades of both gold and copper. The mine's production will be critical to bridge the gap between declining grades at our existing mines at Gedabek and our larger, new concessions entering production in the medium-term."
Mineral Resource estimation and current work at the Gilar deposit
Further details about the Gilar deposit, the mineral resource estimation and the current work being carried out at Gilar can be found below.
Divulgation de la réglementation sur les abus de marché (MAR)
Certaines informations contenues dans cette annonce auraient été considérées comme des informations privilégiées aux fins de l'article 7 du règlement (UE) n° 596/2014, qui a été incorporé dans le droit britannique par la loi de 2018 sur l'Union européenne (retrait) jusqu'à la publication de cette annonce. .
Pour de plus amples informations s'il vous plaît contacter:
Anglo-Asian Mining plc | |
Reza Vaziri, directeur général | +994 12 596 3350 |
Bill Morgan, directeur financier | +994 502 910 400 |
Stephen Westhead, vice-président | +994 502 916 894 |
SP Angel Corporate Finance LLP (Conseiller désigné et Broker) Ewan Leggat Capuche d'Adam | Tel: + 44 (0) 20 3470 0470 |
Hudson Sandler (RP financière) Charly Jack Harry Griffiths | Tél : +44 (0) +20 (7796)4133
|
Gilar deposit
The detailed JORC ('Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition') "JORC" Mineral Resource estimate for the Gilar deposit has been published on the Company's website and is available at:
https://wp-angloasianmining-2020.s3.eu-west-2.amazonaws.com/media/2023/12/UPG12006_GILAR_MRE_REPORT_FINAL.pdf.
The Table One report accompanying the JORC Mineral Resource estimate is available at:
https://wp-angloasianmining-2020.s3.eu-west-2.amazonaws.com/media/2023/12/UPG12006_GILAR_JORC_TABLE1_FINAL.pdf.
The initial announcement about the Gilar deposit, dated 8 December 2022 - "Significant mineralisation in Gilar drill results" which gives the background to the Gilar property is available on the Company's website.
Current work at the Gilar deposit
The development of the Gilar deposit is now well under way. Both the primary transport decline tunnel for accessing the mineralisation and a ventilation tunnel are being constructed. 561 metres of the main decline and 150 metres of the ventilation tunnel have been completed, with 900 metres and 383 metres respectively remaining to be constructed.
Infrastructure development is ongoing with the construction of a heavy earthworks equipment workshop, mine office facilities and technical support and services offices. Security and safety fencing, mine entrance area and power generator set foundations are under construction.
Land has been identified for the haul road from the Gilar portal to the Gedabek processing plant and permission applied for the appropriate government departments to provide the required access.
There is no immediate surface exploration drilling planned. Further surface drilling will be carried out in the future to test the extension of the upper zones. This will be undertaken once the results of the ongoing geophysical investigation data acquired are interpreted and targets defined for both extensions of the known mineralisation and new targets. The geophysical work includes electrical (induced polarisation) and gravity methods. These data will be used in conjunction with existing satellite data and ZTEM electromagnetic and magnetic data.
It is further planned to drill from underground to investigate the extension potential of the lower Zone 4, identified by two surface drillholes as an extension to the lower Zone 4 once the tunnelling reaches the mineralisation. Mining options and design and operational mine parameters will now be assessed as the maiden JORC mineral resource is complete.
The underground haulage mining fleet for the Gilar mine has now arrived at the Gedabek site. The equipment is being supplied by Caterpillar as notified in the announcement of 22 February 2023. This will be the first Caterpillar underground equipment to be deployed in Azerbaijan. A ceremony will be held at Gedabek on the afternoon of Monday 11 December 2023 to mark the arrival of the equipment.
Gilar mineral resources - supporting work and independent expert opinion
The Company contracted Mining Plus UK Ltd (Mining Plus) to estimate the Mineral Resource of the Gilar deposit. This report incorporated all the data from the most recent drilling campaign and was designed to increase resource confidence in the deposit with the aim to convert the majority of mineralised material to or above an Indicated classification under the JORC (2012) code, alongside using inclined holes to better understand the ore body geometry.
Déclaration de la personne compétente
The information in the announcement that relates to exploration results and Mineral Resources is based on information compiled by Sean Lapham, who is a full-time employee of Mining Plus UK Ltd with the position of Senior Geology Consultant. Mr Lapham is a registered member of The Australasian Institute of Mining and Metallurgy (AUSIMM number 318874) and the Geological Society of London (Fellowship number 1030350).
Sean Lapham has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Sean Lapham consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.
Sean Lapham has extensive experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking, to qualify as a "competent person" as defined by the AIM rules. Sean Lapham has reviewed the Mineral Resources included in this announcement.
Notes aux rédacteurs:
Anglo Asian Mining plc (AIM : AAZ) est un producteur d'or, de cuivre et d'argent disposant d'un portefeuille d'actifs de production et d'exploration de haute qualité en Azerbaïdjan. La Société a produit 57,618 31 onces d'équivalent or (« GEO ») pour l'exercice clos le 2022 décembre XNUMX.
Le 30 mars 2023, la Société a publié son plan stratégique de croissance qui montre une voie clairement définie pour la transition de la Société vers un producteur multi-actifs de niveau intermédiaire de cuivre et d'or d'ici 2028, date à laquelle le cuivre sera le principal produit de la Société, avec une production prévue d'environ 36,000 2024 tonnes équivalent cuivre. Elle prévoit de réaliser cette croissance en mettant en production quatre nouvelles mines entre 2028 et XNUMX à Zafar, Gilar, Xarxar et Garadag.
La Société en détient environ 17.4 pour cent. de Libero Copper & Gold Corporation (« Libero »). Libero est coté à la Bourse de croissance TSX au Canada et possède, ou a la possibilité d'acquérir, plusieurs propriétés d'exploration de cuivre en Amérique du Nord et du Sud, notamment Mocoa en Colombie, l'une des plus grandes ressources de cuivre-molybdène non exploitées au monde.
https://www.angloasianmining.com/
ANNEXE
GLOSSAIRE DES TERMES ET ABRÉVIATIONS
The following definitions are extracted from the JORC Code, 2012 Edition
Ressources minérales indiquées | Une « ressource minérale indiquée » est la partie d'une ressource minérale pour laquelle la quantité, la teneur (ou la qualité), les densités, la forme et les caractéristiques physiques sont estimées avec suffisamment de confiance pour permettre l'application de facteurs de modification avec suffisamment de détails pour soutenir la planification et l'évaluation de la mine. de la viabilité économique du gisement. Les preuves géologiques sont tirées d'explorations, d'échantillonnages et d'essais suffisamment détaillés et fiables recueillis par des techniques appropriées à partir d'emplacements tels que des affleurements, des tranchées, des fosses, des travaux et des trous de forage, et sont suffisantes pour supposer une continuité géologique et de teneur (ou de qualité) entre les points d'observation où les données et les échantillons sont recueillis. Une ressource minérale indiquée a un niveau de confiance inférieur à celui qui s'applique à une ressource minérale mesurée et ne peut être convertie qu'en réserve de minerai probable. |
Ressources minérales présumées | Une « ressource minérale présumée » est la partie d'une ressource minérale pour laquelle la quantité et la teneur (ou la qualité) sont estimées sur la base de preuves géologiques et d'un échantillonnage limités. Les preuves géologiques sont suffisantes pour impliquer mais non pour vérifier la continuité géologique et de la teneur (ou de la qualité). Il est basé sur des informations d'exploration, d'échantillonnage et de test recueillies par des techniques appropriées à partir d'emplacements tels que des affleurements, des tranchées, des fosses, des chantiers et des trous de forage. Une ressource minérale présumée a un niveau de confiance inférieur à celui qui s'applique à une ressource minérale indiquée et ne doit pas être convertie en réserve de minerai. Il est raisonnable de s'attendre à ce que la majorité des ressources minérales présumées puissent être transformées en ressources minérales indiquées avec une exploration continue. |
JORC | JORC stands for Australasian Joint Ore Reserves Committee (JORC). The Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) is widely accepted as the definitive standard for the reporting of a company's resources and reserves. The latest JORC Code is the 2012 Edition. |
Ressource minérale mesurée | A 'Measured Mineral Resource' is that part of a Mineral Resource for which quantity, grade (or quality), densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes, and is sufficient to confirm geological and grade (or quality) continuity between points of observation where data and samples are gathered. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proved Ore Reserve or under certain circumstances to a Probable Ore Reserve |
Mineral Reserves or Ore Reserves
| An 'Ore Reserve' is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at Pre-Feasibility or Feasibility level as appropriate that include application of Modifying Factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. |
Ressources minérales | Une « ressource minérale » est une concentration ou une occurrence de matière solide d'intérêt économique dans ou sur la croûte terrestre sous une forme, une teneur (ou une qualité) et une quantité telles qu'il existe des perspectives raisonnables d'extraction économique éventuelle. L'emplacement, la quantité, la teneur (ou la qualité), la continuité et d'autres caractéristiques géologiques d'une ressource minérale sont connus, estimés ou interprétés à partir de preuves et de connaissances géologiques spécifiques, y compris l'échantillonnage. Les ressources minérales sont subdivisées, par ordre de confiance géologique croissante, en catégories présumées, indiquées et mesurées. |
RNS peut utiliser votre adresse IP pour confirmer le respect des termes et conditions, pour analyser votre interaction avec les informations contenues dans cette communication et pour partager cette analyse de manière anonyme avec d'autres dans le cadre de nos services commerciaux. Pour plus d'informations sur la manière dont RNS et la Bourse de Londres utilisent les données personnelles que vous nous fournissez, veuillez consulter notre Politique de confidentialité.